A Dataverse model the app can grow on
Tables for the things you track, typed columns, global choices, and relationships with cascade behaviour chosen on purpose — the structure every generated screen is drawn from.
Model-driven app development services
You know the process needs a model-driven app; this is the build. Senior US-based engineers model the Dataverse tables underneath it, compose the forms, views, charts and dashboards your team works in all day, add the business rules and process stages that keep records honest, and map security roles to real jobs. Model-driven app development for one written fixed fee, in your own tenant, typically in 2–4 weeks with 30 days of hypercare.
One fixed price, approved before work begins · 30 days of hypercare included
Sample dashboard. Illustrative data, not a client’s numbers
Every project starts with a written, fixed-fee scope you approve before any work begins. The engineer who scopes it delivers it, and 30 days of hypercare after handover are part of the price.
What you get
A model-driven app is generated from its data model, so most of the craft is in the parts nobody sees on a demo: the tables, the relationships, the rules and the roles. These are the six things we hand over.
Tables for the things you track, typed columns, global choices, and relationships with cascade behaviour chosen on purpose — the structure every generated screen is drawn from.
Main forms with the related records on tabs, quick-create forms for fast entry, and views filtered to each role’s actual workload rather than the default “all active” list.
Where a record moves through stages, a business process flow shows everyone where it is and what is still missing before it can move on.
Required fields, defaults, show-and-hide logic and validation configured as business rules, so the constraint holds without anyone writing or maintaining code for it.
Roles that decide who opens the app, which rows they see and what they can change — tested by signing in as each role before go-live.
System dashboards and view charts so a manager can see open work by stage or owner inside the app, without exporting anything to a spreadsheet first.
How it works
A free consultation covers the records your process runs on, how they relate, who touches each stage and who must not see what. You get an entity sketch, the licence position, a written scope, one fixed price and a date before anything is built.
Tables, forms, views, business rules, process stages and security roles are built inside a named solution in a development environment, with short working sessions so your team uses the app while it is still cheap to change.
The solution is promoted through test to production, existing records are loaded, your owner is walked through each designer, and 30 days of hypercare cover the questions that only appear once real work starts.
Describe the process the app should run and who works in it, and we’ll scope the build.
Book a free consultation →A model-driven app is a Power Apps app generated from a Dataverse data model. You do not draw its screens; you add forms, views, charts and dashboards to tables, and the platform lays them out. The work therefore goes into the data model and the rules around it, which is why the build is scoped from records, not screens.
Microsoft’s model-driven apps overview (opens in new tab) puts it plainly: it is “often easier to think of them as data model driven apps”, because without a data model housed in Dataverse you cannot create one at all. The same page lists the advantages that follow once the model exists — a relatively rapid build through component-focused designers, automatic responsiveness and accessibility, a consistent experience across every model-driven app in your organization, and straightforward movement between development, test and production through solutions. Each of those is real, and each depends on the model being right first.
That decision comes first, and it is a separate page. Our comparison of canvas apps vs model-driven apps settles which shape the requirement needs. This page sells the next stage: the build itself, once the answer is model-driven or a model-driven core with a custom page for the simple screens.
If the comparison is still open, read that first; we will not sell a model-driven build to a requirement that is really one task on a phone. And if you want both shapes, or a wider set of apps across a department, the umbrella engagement is our custom Power Apps consulting service, which scopes canvas and model-driven work together under one fixed fee.
Microsoft breaks model-driven app making into five areas: modelling business data, defining business processes, composing the app, configuring security roles and sharing it. The table maps each area to what we build and what you receive, because the fixed fee is set from exactly these items, not from a day rate.
| Build area | What we build | What you receive |
|---|---|---|
| Modelling business data | Custom tables, typed columns, global choices, alternate keys, and one-to-many or many-to-many relationships with deliberate cascade rules | An entity-relationship diagram and a data dictionary your own team can read |
| Defining business processes | Business process flows for staged records, business rules for validation and defaults, and Power Automate flows where something must happen off-screen | A written list of every rule and stage, and what triggers it |
| Composing the app | Site map navigation, main and quick-create forms, role-specific views, charts, dashboards, and custom pages where a canvas-style screen fits better | A working app in your tenant, reviewed by the people who will use it |
| Configuring security roles | Roles mapped to job functions, with privilege levels scoped to the user, business unit or organization, and teams for cross-cutting access | A role matrix, tested by signing in as each role before go-live |
| Sharing and release | A named solution with your publisher prefix, promoted from development through test to production, with environment variables for settings that differ | The solution files, a release checklist and an admin walkthrough |
| After go-live | Fixes and small adjustments as real records and real users arrive | 30 days of hypercare included in the fixed fee |
Want these build areas sized for your process? Describe it and we’ll scope each one.
Scope my model-driven app →Because the interface is generated from it. Once the tables and relationships are settled, forms and views go quickly; when a relationship is wrong, every form, view and role built on it has to be revisited. So we agree the model in writing during the first week, and the rest of the two-to-four-week window follows from it.
Where the process spans several departments, or the data model will serve flows, reports and other apps as well as this one, the data layer can be scoped on its own through our Microsoft Dataverse consulting services. For a single process, it is part of this build and priced inside the same fixed fee. Building inside a solution from day one is not optional: Microsoft’s documentation on solutions (opens in new tab) describes them as the way apps and components are transported between environments, and a model-driven app built loose in a default environment is the one that cannot be moved later.
The build is a one-off fixed fee; the licence is recurring and billed by Microsoft. Because a model-driven app always runs on Dataverse, every person who opens it needs a standalone Power Platform licence, not just the Power Apps rights inside a Microsoft 365 seat. We price that position against your headcount before you approve anything.
Microsoft’s Power Platform licensing FAQ (opens in new tab) states that accessing an environment with Dataverse requires users to hold a corresponding standalone licence for each service used. That is the single number most likely to change a business case, so the per-user and per-app options are worked through in our guide to Power Apps licensing for small business. We do not resell licences, so there is nothing in the recommendation for us either way.
It fits a team whose work is a record with a life — a case, a job, an application, an asset — that several people touch in stages, where everyone needs to see the related notes, contacts and documents without leaving the record. It also fits an office team that lives in one system all day and values consistency over a bespoke layout.
It fits less well when the whole requirement is one quick task in the field, when the data has to stay in SharePoint lists, or when the screen must look exactly like your brand. Those are canvas requirements, and we will say so in the free consultation. Our fixed-fee process page explains how the written scope is produced and what handover covers; the work is delivered remotely by senior US-based engineers from our Orange County, CA base, serving every US state, and everything built stays in your own tenant.
Manual work cost check
Put a number on the hours your team spends doing by hand what a report, an app or a flow could do: re-keying data, chasing approvals by email, rebuilding the same spreadsheet every week.
The math is simple: hours each person spends per week × number of people × 52 weeks gives the hours a year. Multiply by your loaded hourly cost for the dollars a year.
Salary plus benefits and overhead, divided by hours worked. Use your own figure.
Your estimate
Enter your three numbers to see the hours and cost a year.
One fixed price, approved before work begins · 30 days of hypercare included
Your numbers, your estimate. It is not a quote and not a savings promise; your fixed price comes in a written proposal after the free consultation.
Fair and square
Every project gets a written proposal with one fixed price for a defined scope, and you approve it before any work starts. No hourly meter and no retainer. If the scope changes, the price changes in writing first.
Reports, apps, flows, sites and documentation are built in your Microsoft tenant, under your accounts. There is no proprietary layer and no ongoing license owed to us, so nothing breaks if you never hire us again.
For 30 days after handover we fix defects in what we delivered, answer your team’s questions and make small adjustments that keep it working as scoped, at no extra cost.
A senior, US-based engineer works with you from the first call to the handover. There is no junior bench and no offshore handoff.
Straight answers. The free consultation ends with either a fixed-fee proposal or an honest recommendation that we are not the right fit.
Talk to an engineer, not a sales rep. Microsoft Made Easy is a Lightray Solutions brand, founded by Edward Pinela and headquartered in Orange County, California. Senior engineers across the Microsoft stack deliver fixed-fee projects for companies in every US state, remotely. About us
FAQ
A finished model-driven app in your own tenant: the Dataverse tables and relationships it runs on, the forms, views, charts and dashboards people use, business rules and process stages, security roles mapped to real jobs, a site map, and the solution that carries it from development to production, plus 30 days of hypercare.
Typical delivery is two to four weeks, and the data model decides where a project lands. Once tables and relationships are agreed, forms and views go quickly because the platform generates much of the interface. A handful of tables with simple security sits at the short end; several business units and data migration sit at the long end.
Yes. A model-driven app runs on Dataverse by definition, and Microsoft's licensing terms require every user of a Dataverse environment to hold a standalone Power Platform licence, not just a Microsoft 365 seat. We confirm the licence position against your headcount during scoping, before you approve the fee, so the monthly cost is never a surprise.
Mostly, yes. Adding a column to a form, a new view, or a chart is configuration rather than code, and we walk your nominated owner through each designer during handover. Changes go through a development environment inside the solution, not straight into production, and anything involving security roles or business rules is documented step by step.
When the job is one bounded task done on a phone, when the data must stay in SharePoint, or when the screen has to match your brand. Those are canvas-app requirements. If you are not sure which shape you need, settle that first; we will say so in the free consultation rather than sell the wrong build.
Tell us which records the app manages and who needs to work in it. You get one written price for a defined scope, typical delivery in 2–4 weeks, and 30 days of hypercare after handover.
Free consultation · Written fixed price before any work starts · Reply within one business day
Tell us what you’re trying to fix — a report, an approval process, an intranet, a Copilot rollout. We scope it as a fixed-fee project, you approve, and a senior engineer delivers in 2–4 weeks.
Related services
The umbrella engagement for canvas and model-driven apps together, scoped as one fixed-fee project across a department.
The data layer on its own — tables, relationships, security roles and capacity — when several apps and flows will share it.
Fixes, changes and release discipline once the app is live and the build team has handed over.