After the April 2, 2026 retirement
SharePoint add-in to SPFx migration services for add-ins that already stopped working
Your add-in already stopped working. A web part on the home page shows an error, a request form will not open, or a nightly sync has quietly failed since early April. We triage every add-in in the tenant, recover the data it was holding, and rebuild the ones that still matter as SPFx web parts, Power Apps forms or plain list formatting. Senior US-based engineers scope it in writing as one fixed fee, with typical delivery in 2–4 weeks and 30 days of hypercare.
Free, no-obligation consultation · Reply within one business day
Sample dashboard. Illustrative data, not a client’s numbers
What stopped working on April 2, 2026
Microsoft retired the SharePoint Add-in model in SharePoint Online in two stages. Add-ins stopped working for new tenants on November 1, 2024, and for every remaining tenant on April 2, 2026, including Government Clouds. Microsoft’s SharePoint Add-In retirement announcement (opens in new tab) states that both kinds were affected: SharePoint-hosted add-ins, which put web parts and pages into a site, and provider-hosted add-ins, which ran on their own servers and called back into SharePoint.
Azure Access Control Services (ACS), the sign-in layer provider-hosted add-ins relied on, was retired for SharePoint Online on the same date. The Azure ACS retirement article (opens in new tab) says plainly that there is no option to extend ACS use with SharePoint Online beyond April 2, 2026. That is why a script or sync that authenticated with an app-only ACS principal, even one that was never installed as an add-in, failed at the same moment as the visible web parts.
The SharePoint Add-Ins and Azure ACS retirement FAQ (opens in new tab) confirms what was not affected. The SharePoint Framework (SPFx) is the recommended replacement and continues to be supported, tenant and site collection app catalogs remain, and CSOM and JSOM keep working. So the fix is not a new platform. It is a replacement, add-in by add-in, using tools your tenant already has.
How the triage works
Five steps from a broken tenant to working replacements
Every add-in gets the same treatment, so nothing is rebuilt that nobody uses and nothing in use is missed.
- 1
Inventory
We run the Microsoft 365 Assessment tool against your tenant. Its SharePoint Add-In and Azure ACS reports list every add-in by site, where it came from, who installed it, and every ACS principal with its permissions and the sites it can reach.
- 2
Classify
Each add-in is marked SharePoint-hosted or provider-hosted, custom or vendor-supplied, and in use or abandoned. A short conversation with the people who relied on it settles what it actually did for them.
- 3
Map to an outcome
Each one gets a single outcome from the table below: SPFx web part or extension, Power Apps form, JSON list formatting, the vendor’s updated version, or retirement. You approve the list and one fixed fee.
- 4
Recover app-web data
Items an add-in kept in its own app web are copied out through the SharePoint APIs into a list on the host site, in the shape the replacement needs, before anything is uninstalled.
- 5
Re-register integrations
Integrations that signed in through Azure ACS move to a Microsoft Entra ID app registration with only the permissions they need. Then the replacements go live, with documentation and 30 days of hypercare.
The triage table: what each add-in becomes
Microsoft’s guidance is to rebuild custom add-ins on SPFx and to ask vendors for an updated version of anything bought. In practice, a lot of add-ins were simpler than that implies. We pick the lightest replacement that does the job, because anything coded has to be maintained afterwards. Effort below is relative, not a quote; the written scope sets the fee.
| What the add-in did | Add-in type | Outcome path | Typical effort |
|---|---|---|---|
| Showed a styled list, a status board or a simple rollup on a page | SharePoint-hosted | JSON column and view formatting, or a standard web part | Light |
| Collected requests or entries through its own form | SharePoint-hosted | A Power Apps form on a SharePoint list | Light to moderate |
| Rendered a web part (add-in part) with custom logic | SharePoint-hosted | SPFx web part | Moderate |
| Added a ribbon button, menu item or site-wide script | SharePoint-hosted | SPFx extension (command set or application customizer) | Moderate |
| Came from a vendor or the public marketplace | Either | The vendor’s updated, non-add-in version; if none exists, triaged like a custom add-in | Light when an update exists |
| Ran a scheduled job, sync or remote event receiver against SharePoint | Provider-hosted (small) | Entra ID app registration; remote event receivers moved to SharePoint webhooks | Moderate |
| Was a full custom web application with its own users and screens | Provider-hosted (large) | Custom development, scoped as its own project | Outside this service |
| Nobody has missed it since April | Either | Retire, after any app-web data is recovered | Light |
Not sure which approach suits your retired add-ins? A senior engineer will talk it through with you, at no cost.
Talk to an engineer →Do not uninstall the broken add-ins yet
Microsoft’s retirement FAQ warns that an add-in’s app web is deleted when the add-in is uninstalled, and that data must be retrieved before that happens. If one has already been removed, it can be restored from the recycle bin along with its app web, so check there before assuming the data is gone.
Where this service stops
This is triage and rebuild work for SharePoint-hosted add-ins and for small provider-hosted integrations: a timer job, a list sync, a remote event receiver, a script that used an ACS client ID and secret. Moving those to an Entra ID app registration is usually a contained change to how the code signs in, plus the permissions it is granted. Microsoft also notes that remote event receivers registered through an Entra application have a separate retirement date of July 1, 2027, so where a receiver is kept for now rather than moved to webhooks, we record that date in your handover notes. Our guide to the SharePoint remote event receivers retirement explains that deadline and how to choose between webhooks and a Power Automate flow for each receiver.
Some provider-hosted add-ins were really whole applications: their own database, their own screens, their own users, with SharePoint as one small piece. Rebuilding one of those is a custom development project with its own requirements and testing, and it does not fit a 2–4 week fixed-fee triage. If the inventory turns one up, the written assessment says so and scopes it separately rather than folding it in.
Rebuild, extend, connect or move
This page is for a specific situation: something that worked until a fixed date, then broke. The aim is to get back what people relied on, not to add new features along the way. For tenants whose add-ins are already retired and who want new SPFx extensions built from scratch, see our SharePoint customization services. Where the broken piece was really a link between SharePoint and another system, such as a CRM, ERP or line-of-business database, and you want that connection redesigned rather than just re-authenticated, our SharePoint integration services cover the wider integration.
On-premises farms are a different case. Microsoft states that add-ins in SharePoint Server are not retired when deployed from an on-premises app catalog, and SharePoint Server farms were not affected by the ACS retirement. Custom web parts and full-trust solutions there become a problem only when the farm moves to the cloud, and that triage is part of SharePoint Server to SharePoint Online migration. Once the replacements are live, anything that drifts afterwards falls under SharePoint support and maintenance.
Who this fits
The typical fit is a business that has run SharePoint Online for years, picked up a few add-ins along the way from a former employee, an old partner or the marketplace, and has no in-house SharePoint developer. Usually it is clear that something broke and less clear what else did. The inventory answers that before any rebuild is priced. Work is scoped through our fixed-fee process and delivered remotely across all US states from our Orange County, CA base, by senior US-based engineers.
The overrun risk sits with us, not you
Every engagement starts with a free consultation and a written scope: deliverables, timeline and one fixed price. You approve it before any work begins, and scope changes are agreed in writing. 30 days of hypercare after handover are included.
FAQ
Questions about replacing retired add-ins
No. Microsoft retired SharePoint Add-ins in SharePoint Online on April 2, 2026, and stated there would be no option to extend Azure ACS, which provider-hosted add-ins depend on, beyond that date. The practical path is to replace each add-in that still matters and retire the ones nobody needs.
Not necessarily. A SharePoint-hosted add-in often kept list items in its own app web. Microsoft notes the app web is deleted when the add-in is uninstalled, so the first rule is to leave broken add-ins installed until that data has been copied out through the SharePoint APIs and recreated where the replacement can use it.
No. SPFx is the replacement Microsoft recommends, but many add-ins were only a form, a status display or a small lookup. Those often fit a Power Apps form on a SharePoint list or JSON column and view formatting, which your own site owners can maintain. Code is used only where those lighter options cannot do the job.
Yes, though the first step is usually a question to the vendor. Microsoft advises asking third-party providers for an updated version that does not depend on the add-in model. If the vendor has an SPFx release, we help install and configure it; if they have stopped supporting the product, it goes through the same triage as custom add-ins.
A Microsoft Entra ID app registration with the SharePoint or Microsoft Graph permissions the integration actually needs, typically authenticating with a certificate. The integration's code is updated to request tokens from Entra ID instead of ACS. We scope permissions to the sites it touches where possible, and document the registration so your team can renew credentials.
Not always. Small provider-hosted integrations, such as a scheduled job or a sync that only needs to call back into SharePoint, are in scope. When the add-in's back end is a full custom web application with its own users and screens, rebuilding it is a custom development project, and we say so in the written assessment.
Get your retired add-ins scoped in writing
No hourly meter and no retainer. We scope the work in writing, you approve one fixed price, and the engineer who scoped it does the work.
Free consultation · Written fixed price before any work starts · Reply within one business day
Tell us what you’re trying to fix — a report, an approval process, an intranet, a Copilot rollout. We scope it as a fixed-fee project, you approve, and a senior engineer delivers in 2–4 weeks.
- Fixed-fee scope agreed before any work starts
- Senior, US-based Microsoft engineers — no handoffs
- Typical 2–4 week delivery
- 30 days of post-delivery hypercare included
Related services
When the job is bigger than replacing an add-in
SharePoint Customization
New forms, formatting, SPFx web parts and extensions, and page templates added to a SharePoint Online tenant that is already working.
SharePoint Integration
SharePoint connected to the CRM, ERP and line-of-business systems around it, with authentication and data flows designed together.
Support and Maintenance
Fixed-fee repair work after go-live: permission audits, storage cleanup, search fixes and failed flows, with no retainer.