Common SharePoint migration mistakes, and what to do instead
The common SharePoint migration mistakes are rarely technical. The copy usually works. What goes wrong is that a small business lifts its file share into SharePoint exactly as it was, carries over permissions nobody has reviewed in years, skips the cleanup, leaves metadata for “later” and moves everyone at once without a pilot. Each of these looks like a time saver in week one and turns into rework after cutover. This guide walks through the mistakes we see most often, why each one hurts, and the better practice that avoids it.
Most of the damage is done before the first file moves
A migration tool does what it is told. If the instruction is “copy the S: drive into one site”, it will do that faithfully — including the twelve-level folder tree, the share that every user can edit, and the 2014 archive nobody has opened since. The project then looks finished on the day of cutover and starts to unravel the week after, when people cannot find things, see things they should not, or open a spreadsheet whose links all point at a drive letter that no longer exists.
Microsoft’s own guide to migrating file shares to SharePoint and OneDrive (opens in new tab) puts planning, assessment and remediation ahead of the migration step for this reason. The mistakes below are mostly ways of skipping those phases. The mechanics of running the passes themselves are covered in our file server to SharePoint migration playbook.
Mistake 1: lifting the file share into one site as-is
The fastest-looking plan is one site, one library, and the old drive copied into it unchanged. It reproduces every problem the file share had and adds new ones. Deep folder trees run into SharePoint’s path-length and file-name limits (opens in new tab). One giant library is awkward to sync, slow to browse, and forces every permission decision down into subfolders, where nobody can see it.
The better practice is to split content by who owns it and how it is used: a site per team or function, separate libraries where access or retention genuinely differs, and folders kept shallow inside them. You do not need to redesign everything. Keep the top levels people already recognize, and stop copying the levels that only exist because the file share had no other way to sort things. Our guide to SharePoint folders vs metadata covers that decision library by library.
Mistake 2: copying permissions nobody understands
File shares accumulate access the way attics accumulate boxes. A folder was shared with one contractor in 2019, a group called “Everyone” was given modify rights to stop a support ticket, a former manager still owns half the tree. Copying that model into SharePoint does not preserve security; it preserves confusion, now with the added reach of sharing links and Copilot search.
There is also a technical trap. Microsoft notes that during a file share migration the most restrictive share or NTFS permission sets the final SharePoint level, advanced NTFS permissions are removed, and explicit deny permissions are not migrated — so content that a deny rule used to hide may become accessible. The better practice is to map access to a small number of Microsoft 365 groups per site, have an owner in each team sign it off before the move, and treat any folder with unique permissions as a question to answer, not a setting to copy.
Mistake 3: skipping the cleanup
Every redundant, obsolete or trivial file you migrate has to be packaged, transferred, validated and then searched past by everyone, indefinitely. Duplicate copies of the same contract, ten years of scanned delivery notes, a departed employee’s personal folder: carrying them all over makes the migration longer and the result worse. Version history multiplies the effect, because each retained version is more data to move.
The better practice is an archive boundary agreed in writing before anything is packaged — for example, nothing untouched for a set number of years moves to the new site — with that content parked read-only somewhere cheap rather than deleted. Run the migration tool’s scan early, too. It reports blocked file types, invalid characters and over-long paths, and each of those is remediation work that should start in week one, not on cutover weekend.
Mistake 4: leaving metadata for “later”
“We will add columns once we are in” is a promise almost nobody keeps. After cutover, people are busy and the library already works well enough, so the folder path remains the only way to tell a draft from a final, or one client’s documents from another’s. Search, views and retention all get weaker as a result.
The better practice is modest: decide, before the move, the two or three columns that matter for each important library — client, document type, status, year — and populate them during migration where the folder structure already implies the value. A tool can often tag a file from the folder it came from. That is far cheaper than asking people to tag thousands of files by hand afterwards.
Mistake 5: skipping the pilot
Moving everyone in one go feels efficient and removes the only chance to learn cheaply. Microsoft’s migration walkthrough starts with a pilot on a small set of users to validate performance, communication and feedback, then uses what it learned to plan the rest. For a small business, the pilot can be a single team moved end to end and working in SharePoint for a few days.
Choose that team for being representative, not for being quiet. A pilot group that rarely uses shared files will report no problems, and the problems will then arrive at full scale. Write down every question the pilot raises, update the plan and the user communications, and only then schedule the rest of the waves.
Mistake 6: forgetting the links, the sync client and the people
Three smaller mistakes cause a disproportionate share of the calls in the first week. Embedded links break: Microsoft lists conversion of embedded URLs as something its migration tool does not migrate, so workbooks linked to other workbooks and documents pointing at mapped drives need an inventory and a fix-up pass. Sync gets overloaded when people sync entire large libraries instead of the folders they work in. And users get a cutover email instead of training, so the first week is spent asking where things went.
The better practice is to inventory linked files before the move, set expectations about what to sync and what to open in the browser, and train people before cutover rather than after. Keep the old source read-only for an agreed window instead of deleting it, so “where did it go?” has a two-minute answer.
Mistakes and better practice, dimension by dimension
The same pattern repeats across every part of a migration: the shortcut moves the problem to after cutover, where it is more expensive and nobody owns it.
| Dimension | The common mistake | What it causes after cutover | Better practice |
|---|---|---|---|
| Permissions | Copy the file share’s access as-is, including broad “Everyone” grants and one-off folder exceptions | Oversharing, explicit deny rules that no longer apply, and an access model nobody can explain | Map access to a few Microsoft 365 groups per site and have a named owner in each team approve it before the move |
| Metadata | Move files first and plan to add columns “later” | The folder path stays the only way to find or filter anything, and retention has nothing to work with | Pick two or three columns per key library and populate them during migration from the folder structure |
| Structure | Lift the whole drive into one site and one library, unchanged | Path-length failures, slow sync, and permissions buried deep in subfolders | Split by team or purpose into sites and libraries, and keep the folders inside them shallow |
| Pilot | Move everyone at once, or pilot with a team that barely uses shared files | Every problem surfaces at full scale, on the busiest week of the project | Move one representative team end to end, collect its friction, and adjust the plan before the remaining waves |
| Cleanup | Migrate everything, including duplicates, stale archives and leavers’ folders | Longer transfers, noisier search, and a cleanup that never gets done once the project closes | Agree an archive boundary in writing, park old content read-only, and remediate scan findings in week one |
| Links and cutover | Ignore embedded links and delete the old source on cutover night | Broken workbook links and no way to check what a file looked like before the move | Inventory linked files, run a fix-up pass, and keep the old source read-only for an agreed window |
Want this worked through for your own migration plan? A free consultation is the first step.
Book my free consultation →Which of these are worth getting help with
Several of these mistakes are decisions only you can make: what to archive, who should see what, which columns matter. Help is most useful where the work is technical or where judgment comes from having seen many tenants: designing the site and permission model, running scans and remediation, tagging content during the move, and handling sources that are not a simple file share. An on-premises farm is the clearest example, because site collections, classic workflows and custom code each need assessment first. That is the work our SharePoint Server to SharePoint Online migration service front-loads.
If you are still choosing a route, our SharePoint migration services hub compares the sources we move from. For planning, see how long a SharePoint migration takes and what drives the cost. We deliver migrations as fixed-fee SharePoint consulting: senior US-based Microsoft engineers, scope and price agreed before work starts, typical 2–4 week delivery, and 30 days of hypercare after cutover. We are based in Orange County, California, and work with businesses across the US remotely. Tell us where your files live today, and we will tell you which of these mistakes your plan is most exposed to.
FAQ
Migration pitfall questions, answered plainly
Copying permissions without reviewing them. A messy folder structure is irritating, but an access model nobody understands is a risk, and it is far harder to unpick once people are working in the new site. Deciding who should see what before the move costs days; fixing it afterwards costs months.
Before. Every redundant, obsolete or trivial file you carry over has to be packaged, transferred, validated and then searched past forever. Agree an archive boundary, such as nothing untouched in several years, and move that content to cold storage. Cleanup after cutover rarely happens, because nobody owns it once the project closes.
Yes, and it can be small. Move one representative team end to end, let them work in SharePoint for a few days, and write down what broke. Microsoft's own file share guidance recommends a pilot for exactly this reason: it shows what the plan got wrong while the cost of being wrong is still low.
You can, and for shallow, well-used folders it is often fine. The problem is moving a deep, decades-old tree into one library unchanged: long paths break, sync struggles, and permissions stay buried in subfolders. Split content by team or purpose into separate sites or libraries, and keep the folders that remain shallow.
Because the addresses changed and the migration tool does not rewrite them. Microsoft lists conversion of embedded URLs as something its migration tool does not migrate. Spreadsheets linked to other workbooks and documents pointing at mapped drives need an inventory before the move and a fix-up pass, or a deliberate decision to retire them.
Want a second opinion on your migration plan?
A senior US-based engineer talks it through with you first, at no cost. If there is work worth doing, you get a written scope with one price, and you approve it before anything starts.
Free consultation · Written fixed price before any work starts · Reply within one business day
Tell us what you’re trying to fix — a report, an approval process, an intranet, a Copilot rollout. We scope it as a fixed-fee project, you approve, and a senior engineer delivers in 2–4 weeks.
- Fixed-fee scope agreed before any work starts
- Senior, US-based Microsoft engineers — no handoffs
- Typical 2–4 week delivery
- 30 days of post-delivery hypercare included
Related reading
Plan the move without repeating these
SharePoint Migration Services
Eight sources compared side by side, from file servers and Dropbox to Box, Egnyte and on-premises farms.
SharePoint Server to Online
Leaving an out-of-support farm, where site collections, classic workflows and custom code need assessing first.
How Long a Migration Takes
The phases, what sets the clock in each one, and the quiet delays that never make it onto a plan.